Codrilla Mine Project

Profile

Joint Venture and Manager

Coppabella and Moorvale Joint Venture - managed by Macarthur Coal (C&M Management) Pty Ltd

Ownership

73.3%

Tenements

EPC 676

MLAs 70450 and 70455

Location

The Codrilla deposit is located 30km south east of the existing Moorvale Mine. The Codrilla resource is located 25km south of the intersection of the Peak Downs Highway and the Fitzroy Development Road.

Nearest port

Dalrymple Bay Coal Terminal

Coal types

Low volatile PCI coal (similar to that produced at Coppabella and Moorvale mines)

Mined from the Leichardt seam (1.8 metre average) and Vermont seam (7.8 metre average)

Project status

Once operational, coal will be mined using excavators and trucks, with associated drill and blast.

Coal processing will be undertaken on-site by a contractor through a 600tph CHPP.

Mining and coal preparation activities will be carried out 24 hours per day, seven days per week.


 

Environmental Impact Statement

Volume 1

pdf Supplementary EIS (PDF 21.72MB)

Volume 2

pdf Appendix Cs - Additional Soils Information (PDF 257KB)

Volume 2

pdf Appendix Cs - Additional Soils Information 2 (PDF 4.67MB)

Volume 2

pdf Appendix Ds - Traffic Assessment (PDF 9.87MB)

Volume 2

pdf Appendix Es - Surface Water Assessment (PDF 11.60MB)

Volume 2

pdf Appendix Fs - Ground Water Assessment (PDF 3.18MB)

Volume 2

pdf Appendix F1s - Stygofauna Report (PDF 892KB)

Volume 2

pdf Appendix Gs - Air Quality & Greenhouse Gas Assessment (PDF 2.29MB)

Volume 2

pdf Appendix G1s - Air Risk Assessment (PDF 147KB)

Volume 2

pdf Appendix Hs - Noise & Vibration Assessment (PDF 1.72MB)

Volume 2

pdf Appendix Is - Flora and Fauna Assessment (PDF 7.02MB)

Volume 2

pdf Appendix Js - Social & Economic Assessment (PDF 6.09MB)

Volume 3

pdf Draft Environmental Management Plan (PDF 10.38MB)

Presentationpdf Draft EIS Public Consultation Forum - Nebo (PDF 1.71MB)
Presentationpdf Draft EIS Public Consultation Forum - Valkyrie (PDF 1.78MB)